series
On airThis Old House
Insulation and tile prep is in progress. A motorized multi-slide door is installed.
This Old House
Electrical work for the elevator begins, and the therapy pool is installed.
This Old House
The elevator cab is built, and audiovisual technologies are explored for accessibility.
This Old House
The new mechanical room is revealed. In-wall lights are installed at the front ramp.
This Old House
The homeowners sit down for an interview about their son and Duchenne muscular dystrophy.